Saturday, May 30, 2015

Mystery Quilt Steps 1 & 2

I have long wanted to do a mystery quilt.  When I sat down and made a Quilting Bucket List about 2 years ago, that was on it. A few shops around here have done classes that are mystery quilts, but they were almost always on Saturdays and I worked Saturdays on rotation for most of the past 9 years, and of course these days it is very difficult to do a whole day class, because Munchkin.

So when I stumbled on to a mystery quilt along hosted by Carole From My Carolina Home, I threw my plan to not start any new projects out the window.  First of all, I discovered the quilt along in mid-April, and she started in late March, so I wasn't that behind yet.  And it was scrappy, plus I had enough of a light-colored fabric that would work for the background, so I didn't need to buy anything.  And many of my scraps were already cut to the right size, thanks to when I was cutting scraps into usable sizes pretty regularly. I couldn't start right away, because I was on a strict timeline for Geoff & Laura's quilt, but I knew I wanted to do it and could get caught up when my work went to Fridays off for 2 months of the summer.

I finally finished Step 1 yesterday, which included all of the cutting and making, then squaring up, about a billion half square triangles.  I am doing the lap size.  I chose to do truly scrappy, and didn't really weed out any scraps other than decide to not use batiks.  So there isn't a theme or a color scheme or really anything making it cohesive, other than the background fabric and the fact that I think that including everything tends to make everything go.  It's been fun to see so many of my scraps; many of them are from long ago projects and seem almost like old friends.

Step 2 was not nearly as labor intensive and I was able to complete it in 2 decent evening sewing sessions, last night and tonight.  Here is a sample of the strips from my Step 2:
Since the project is only up to Step 3, I'm very nearly caught up.  Step 4 is scheduled to be posted on June 10th, so as long as I can do Step 3 by then, I'll be on track.  I'm having a blast not knowing what is coming up and wondering what the final product will look like!

Friday, May 29, 2015

Finished! Goeff & Laura's Quilt

This one is a bit of an epic finish, because it was a UFO for so long.  As a wedding quilt, it is over 5 years late.  And I started it before they got engaged.  So to say I am thrilled to finish this is an understatement.


I'm not sure the picture does it justice, as I especially like the main print.  It ended up looking almost rail-fence-like, but that was not my intention.

Geoff and I have been friends since our freshman year in college.  Several years after we graduated, I met his then-girlfriend Laura one weekend that a group of us from college were hanging out in the booming metropolis of Westfield, Massachusetts.  I started making their quilt the week after that visit.  (Yup, I was that sure!)  I already had the main print and an idea of how to use it, and I decided that it would work for the two of them.  The colors in the main print were similar to the color combination on Geoff's website at the time, and it has a very Asian feel and Laura had just spent a year in Japan. The pattern inspiration is a bit hard to explain.  In Quilt Sampler magazine, each feature shop has an original pattern.  The quilt tester for this and several other quilting magazines did a variation of a pattern that I really liked, so I created my own variation of that variation.  How's that for complicated?!

I did the big push to finish this because I knew I would see the recipients over Memorial Day weekend at my college reunion.  Here are Geoff & Laura with the quilt, oddly enough in front of the dorm that both Geoff & I lived in as sophomores.  (Tallest building in the county!)

And just to demonstrate how late this was as a gift, here is their daughter Zoe, almost 3.  She's clearly so excited about the quilt, she's celebrating with jazz hands!
This is a Quarter 2 finish for the Finish Along, hosted by Adrianne at On the Windy SideClick here for my original project list for Q2.

This was also my May goal for A Lovely Year of Finishes.  I was goal-setter #62 at Sew BitterSweet Designs.  

My Button

Tuesday, May 5, 2015

A Lovely Year of Finishes: May Goal

When looking at other crafters' Quarter 1 finishes for the Finish Along, I saw a lot of people linking to something called A Lovely Year of Finishes.  I saw it often enough that I went investigating.  Like the Finish Along, the goal is to help motivate you to finish projects.  Basically, each month you pick one project that you want to finish.  Finish can even be loosely interpreted, so it's really more about picking a single goal for the month and meeting it.

I saw all this about 8 hours to late to participate for April.  And of course since I don't have a project until May, I won't actually have a full lovely year of finishes.  But since goal-setting seems to be helping me complete projects, I'm joining in.

I should be seeing Geoff & Laura at what is Geoff's & my college reunion over Memorial Day weekend.  So last month I got it out, decided not to tie it as originally planned but to machine quilt it even though it is huge, got the quilting done and the binding attached.  Now I just need to finish the binding, make and attach a label, and gift it!



Linking with hosts Sew BitterSweet Designs and Fiber of All Sorts

Finished! Ocean-themed baby quilt!

When I switched jobs in February, I inherited 2 expecting coworkers.  Since I adore making baby quilts and none of my friends or relatives are currently expecting, this was good news.

First due was my coworker Blaise.  I had planned to give him (or rather, his expected daughter) the all animal I Spy quilt that is finished but had no intended recipient.  But then at the baby shower at work, I learned that the theme for the nursery was The Little Mermaid.  And I spent the drive home that day thinking about all the ocean-themed I Spy squares I had.  So that night I got out my I Spy squares, sorted out everything ocean and mermaid related, and picked my 41 favorites.

There are a total of 6 mermaid squares.  I had just enough of that aqua dot to do the alternating squares--I thought it looked ocean-y.  This was the first project I did entirely on my new sewing machine.  I also did the binding completely by machine and used one of my new decorative stitches.  I actually think it was too dense a stitch and wish I had chosen a different one, but by the time I decided I didn't love it, it was too late.  I had hoped the circles would look like bubbles, but they don't really.  Oh well.

Baby Poesy arrived April 1st and I had the quilt ready when her dad returned to work 2 1/2 weeks later.  But there was a mix-up when the baby's name was emailed out to staff, and the last name I had on the original label was wrong.  So I took it home, made & attached a new label, and am pleased to say the quilt is now with baby Poesy.

This is a Quarter 2 finish for the Finish Along, hosted by Adrianne at On the Windy Side.  Click here for my original project list for Q2.  Please note that this is listed as "Blaise's baby quilt" on that list. 

And a mini-rant/soapbox moment: I mentioned that there are 6 mermaid squares in this quilt.  All of the mermaids are white.  Not a single mermaid of color of any ethnicity or background to be found.  Now, I was working exclusively with stash, but I'm fairly certain that what I have is a decent representation of what is out there, mermaid-wise.  We can do better, fabric designers and fabric manufacturers!

Wednesday, April 22, 2015

Finished! Project Bags: Round 2

Earlier this year, I took a class for these project bags.  I liked them so much, I got a bit carried away and made what was essentially a triple batch.  The pattern makes 4 different sizes, S, M, L, & XL.  For this second round, I made 2 XL and 3 of each of the other sizes.

Not the greatest picture, but they are all there!

One of the small ones was made for a friend's upcoming birthday.  She may actually get more; she recently saw one of the large bags I had a project in and she loved it, so I suspect I'll give her a few.

I really like these, and one of the reasons I made so many is that I have been reorganizing and I'm really trying to 1) stay organized and 2) actually finish things.  Getting distracted by things like ridiculous numbers of project bags doesn't help, but I do like using them.  I also used only fabric I already had, and it was particularly fun to pick out fabrics and use some of the ones I had been saving.  One of the medium bags is a fat quarter of Alaska's state flower that I bought on my honeymoon.

Project bags filled with projects!
This is a Quarter 2 finish for the Finish-Along hosted by Adrianne at On the Windy Side.
Click here for the original project list.

Thursday, April 9, 2015

Quarter 2 Goals

In January, I discovered the Finish-Along hosted by Adrianne.  One thing that I really love about the finish along is that I realize I'm not the only quilter with a zillion unfinished projects! I definitely have more inspiration than I do time!

 In Quarter 1 of the finish-along, I completed 6 projects. I am very pleased with that. My list for this quarter is super long. I'm thinking of it more as a list for the rest of the year (and probably beyond!) and I'll just keep rolling projects over. An asterisk (*) indicates that the project was on the list for Q1. 

Many of the projects I added for this quarter were actually started before last quarter, I just knew I wouldn't get to them in the short-term. I am also trying to do at least 2 Project Linus quilts per quarter, using up fabric I already have and utilizing fairly simple patterns. 

Project Name/Description Project Type Project Status at start of quarter Completion Date
Project bags, round 2 bags 2 left to finish

Blaise's baby quilt Child size Top completed

Katie's baby quilt Child size Fabric & pattern chosen

Verona's I Spy Twin bed size Some cutting done

Emily's I Spy Lap size Some cutting done

Pepper Tote Bag In process

Paper Piecing project Bucket list/mini quilt 1 block completed

Winnie the Pooh quilt (project Linus) Child size Fabrics chosen

Magician/Star quilt (project Linus) Child size Fabrics and pattern chosen

Food picnic quilt Huge 40 or 50 blocks completed

Laura's quilt Double/queen Piecing the top stage

Savannah Lap size? Bigger? Piecing the top stage

*“Sarah” (to be renamed) Wall hanging Layered

*Geoff & Laura's wedding quilt Bed sized Layered

*Alaska cutout quilt Wall hanging Layered, quilting begun (hand quilting)

*White/pastel dogwood quilt Lap size Top completed

*Rainbow I Spy Child size Top completed

*Last big 9-patch Child size Top completed

*Debbie quilt Bed size Top completed, repair needed before continuing

*Elephant ticker tape quilt Bucket list/wall hanging Embroidery outline completed

*Dinosaur quilt (project Linus) Child size Fabrics chosen

2 ½ inch strip I Spy quit Child size Fabrics chosen; most cutting done

Puffin Kit (wall hanging) Kit


I don't have pictures of everything, mostly because I'm recovering from a stomach bug and just don't have the energy to pull everything out.  But here are a few photos, to document that these projects really do exist:

Baby quilt for coworker, top completed.

Round 2 of the project bags.  Just 2 left to finish!

Project Linus Quilts: magicians/stars, Winnie-the-Pooh, and dinosaurs.


Pepper Tote.  I usually don't do "three dimensional" projects.  The Project Bags made me brave.  Starting this may have been a mistake. 

Food picnic blanket.  This is one that I don't expect to finish this quarter, but I would like to work on.


I spy quilts for me (in project bag), a coworker's baby (pile with moose on top), and Verona (not pictured).

Paper pieced project.  Sigh.  Not at all sure about this one.

Elephant ticker tape quilt.  This one may be the only non-finish from Q1 that I really did make progress on.  The outline for my elephant is stitched, and I've pulled all my purple scraps (in that project bag!), so now I just need to, you know, actually fill in the elephant.

Again, I have no illusions that I will get all of this done in 2015, let alone in Q2.  But setting goals is helping, and I really am trying 1) not to start new projects and 2) when I do, to at least use up what I have and not buy new fabric.

2015 FAL at On the Windy Side

Thursday, April 2, 2015

First Quarter Finish Along: Report

I've been doing the finish-along hosted by On the Windy Side.

2015 FAL at On the Windy Side

In the first quarter, I finished 6 projects.  Yay!  Here is the rundown of what I had in progress and what I actually finished:

Project Name/Description Project Type Project Status at start of quarter Completion Date
Project bags Bags Fabric chosen February 1
Animal I Spy Child size Layered February 8
Butterfly quilt (project Linus) Child size Top completed February 16
Dogwood wall hanging Wall hanging Layered, quilting begun February 28
Monkey quilt (project Linus) Child size Fabrics chosen March 9
String quilt I spy Bucket list Strings sorted March 22
“Sarah” (to be renamed) Wall hanging Layered

Geoff & Laura's wedding quilt Bed sized Layered

Alaska cutout quilt Wall hanging Layered, quilting begun (hand quilting)

White/pastel dogwood quilt Lap size Top completed

Rainbow I Spy Child size Top completed

Last big 9-patch Child size Top completed

Debbie quilt Bed size Top completed, repair needed before continuing

Elephant ticker tape quilt Bucket list/wall hanging Pattern re-sized to my liking

Dinosaur quilt (project Linus) Child size Fabrics chosen