Well, today I learned about the Finish Along, which is basically a group of people doing the same thing! http://www.onthewindyside.co.nz/p/2015-finish-along.html
There is no penalty for not finishing a project, so there are more on my list than are likely to be compelted before the end of March. But here is my goal/wish list:
Project Name/Description | Project Type | Project Status at start of quarter | Completion Date |
Dogwood wall hanging | Wall hanging | Layered, quilting begun | |
“Sarah” (to be renamed) | Wall hanging | Layered | |
Geoff & Laura's wedding quilt | Bed sized | Layered | |
Alaska cutout quilt | Wall hanging | Layered, quilting begun (hand quilting) | |
White/pastel dogwood quilt | Lap size | Top completed | |
Project bags | Bags | Fabric chosen | |
Rainbow I Spy | Child size | Top completed | |
Animal I Spy | Child size | Layered | |
String quilt I spy | Bucket list | Strings sorted | |
Last big 9-patch | Child size | Top completed | |
Debbie quilt | Bed size | Top completed, repair needed before continuing | |
Elephant ticker tape quilt | Bucket list/wall hanging | Pattern re-sized to my liking | |
Butterfly quilt (project Linus) | Child size | Top completed | |
Monkey quilt (project Linus) | Child size | Fabrics chosen | |
Dinosaur quilt (project Linus) | Child size | Fabrics chosen |
(not all projects are pictured)
No comments:
Post a Comment